South Jetty Dune Stabilization

Location: Fort Stevens State Park – Hammond, OR
Project Date: Ongoing
Project Type: Environmental
Owner: United States Army Corps of Engineers, Portland District
Summary:  Project consisted of constructing a dynamic revetment to an elevation of 22.00 along the shoreline. Work consisted of approximately 20,000 CY of excavation and 50,000 CY of zoned embankment with imported aggregates ranging in size up to 8” diameter. This project had a critical schedule that had to be completed prior to winter season. Located on a beach within a state park, the South Jetty Dune Stabilization project was completed successfully with no environmental or public impacts. The project was completed within budget, ahead of schedule, with zero safety violations.