WAWSA – WRWD Epping Distribution Part 1

Location: Epping, North Dakota
Project Type: Utilities
Owner: Western Area Water Supply Authority (WAWSA)
Summary: New water distribution line construction. Project consists of furnishing and installing all site work including installation of approximately: 277,600 feet of 2.0-inch water pipeline, 154,500 feet of 3.0-inch water pipeline; 87,200 feet of 4.0-inch water pipeline; one hundred and twelve (112) 2.0-inch, 3.0-inch, 4.0-inch, 6.0-inch and 8.0-inch gate valves. Dual PRV/Meter Pit; six (6) prefabricated pressure reducing valve vaults; flush hydrant assemblies; air release valves with manholes; flush/air blow-off valves; curb stops and frost proof residential meter setter units; steel cased railroad bores; poly case highway bore; non-cased bores and poly Gas/Oil/Salt Line crossings. Tie-ins to the existing infrastructure; tracer wire excavation; backfill, engineered fill; testing; disinfection and all associated valves, fittings and appurtenances; signage; gravel bedding and seeding.

Previous
Previous

Reno Diversion Dam

Next
Next

Montana DOT Infrastructure Extension