Wolf Creek Wastewater System

Location: Wolf Creek, Montana
Project Type: Utilities
Owner: Wolf Creek County Water / Sewer District
Summary: Project consists of the construction of the new wastewater collection system, along with the construction of a new lift station and wastewater treatment facility.  The collection system work includes installation of 5,955 feet of 8” gravity sewer main and 20 manholes; it includes installation of numerous new sewer services and individual septic system abandonment.  Installation of 1,478 linear feet of 3” HDPE force main using directional drilling of approximately 518 feet of 6” HDPE and steel casing. Construction of new lift station on the south side of Wolf Creek as well as complete construction of new wastewater treatment plant – including building construction, site piping, mechanical piping, HVAC, odor control, electrical, plumbing and site work.