Boca Dam Seismic Modifications
Owner: Bureau of Reclamation
Location: Nevada County, California
Project Summary:
Excavate a shear key near the downstream toe, place foundation stabilization material in the bottom of dike excavation, install filter ad drainage layers and toe drain system.
Refill the shear key excavation with material from the In Reservoir Borrow Area (IRBA), place zoned earthfill and rockfill above the shear key, add cast-in-place concrete and steel struts to existing concrete spillway. Install fiber reinforcement polymer strips on the spillway bridge.
Modification to existing electrical system.
Control water during construction, dewatering of dam shear key excavation area, unwatering of dam and dike shear key excavation areas.
Replace existing asphalt pavement on dam crest with continuously reinforced concrete pavement with various traffic barriers and asphalt pavement.
Mill and overlay approximately two miles of Stampede Meadows Road after completing the above principal components of work.